Case Study: Embedding QMS into the Product Lifecycle: From Reactive to Proactive Quality
Practical walkthrough of how a team built quality checkpoints into everyday development followed by peer discussion
- Moving from document-heavy compliance to integrated development checkpoints
- Building quality gates into design, development, and release workflows
- Reducing late-stage remediation through earlier risk and requirements control
- Cultural and tooling shifts required for “living” quality systems